Aras Ibrahim – Civil Engineering and Infrastructure – BEng
Structural Analysis Theory and Design 1
By: Aras Ibrahim
Activity Sheet 1
Sum of vertical forces:
R1 + R2 = 200 + 400 + (6 x 100) = 1200N
Sum of clockwise moments:
(200 x 2) + (400 x 3.5) + (600 x 3) = 3600N
Sum of counter clockwise moments:
6R2 NEquating moments: Finding areas:
6R2 = 3600N Area 1 = 4002+800=1000 (+)
R2 = 600N Area 2 = 1.52200+50=187.5 (+)
R1 = 600N Area 3 = 2.52600+350=1187.5 (-)
Activity Sheet 2 – Task 1
R1 + R2 = 3 + 2 + 2 = 7kN
(2 x 2) + (4 x 2) = 12kN
6 + 6R2Equating moments: Finding areas:
6 + 6R2 = 12Nk Area 1 = 2 x 3 = 6 (-)
6R2 = 6kN Area 2 = 2 x 3 = 6 (+)
R2 = 1kN Area 3 = 2 x 1 = 2 (+)
R1 = 6kN Area 4 = 2 x 1 = 2 (-)
Activity Sheet 2 – Task 2
R1 + R2 = 3 + (8 x 1.5) = 15kN
(3 x 0.5) + (12 x 1.25) = 16.5kN
1.5R2Equating moments: Finding areas:
1.5R2 = 16.5kN Area 1 = 4 x 0.5 = 2 (+)
R2 = 11kN Area 2 = 0.1252=0.0625 (+)
R1 = 4kN Area 3 = (0.875)(7)2=3.0625 (-)
Area 4 = (4)(0.5)2=1 (+)
Activity Sheet 2 – Task 3
R1 + R2 = (36 x 3) + (18 x 12) + (12 x 3) = 360kN
(1.5 x 108) + (6 x 216) + (10.5 x 36) = 1836kN
12R2Equating moments: Finding areas:
12R2 = 1836kN Area 1 = 32(207+45)=378 (+)
R2 = 153kN Area 2 = (2.5)(45)2=56.25 (+)
R1 = 207kN Area 3 = (3.5)(63)2=110.25 (-)
Area 4 = 3263+153=324 (-)
Activity Sheet 2a – Task (a)
...