Manual_IMP6_EN.pdf

(6493 KB) Pobierz
index
iMPX
Wizard.................................................................................... 2
Channeler............................................................................. 3
Rpm Meter............................................................................ 4
Commutator......................................................................... 5
Gas Injector........................................................................... 6
Reducer................................................................................. 7
Real Time Monitor................................................................. 8
Sensoristic.............................................................................. 9
Acoustic Support................................................................ 10
Pointer Level....................................................................... 11
Calibration.......................................................................... 12
Main Menu.......................................................................... 13
Base Map Gas.................................................................... 14
RPM Trimmer........................................................................ 15
Gas Pressure Integrator...................................................... 16
Gas Temperature Integrator............................................. 17
Map Integrator.................................................................... 18
AutoFill Table....................................................................... 19
Base Map Plus.................................................................... 20
Configuration Saving......................................................... 22
Firmware Upgrade............................................................. 23
Inside Interface.................................................................. 24
IMPX
Page 2 of 24
CONFIGURATION WIZARD
Configuration Wizard:
To continue the Configuration Wizard you need to complete the required fields:
Brand, Model, Plaque and Km’s car.
Once done, click on “Forward” and finish the procedure.
IMPX
CHANNEler
Channeler:
IMP6-BLACK CONNECTOR (LEFT SLADGE)
IMP6-BLACK CONNECTOR (LEFT SLADGE)
Page 3 of 24
+Bk1 -B1O -B2O -B3O -B4O -B5O -B6O
RD/WH
F10
BL/BK
F10
RD/BK
F10
GRN/BK
F10
BL/BK
F11
RD/BK
F11
GRN/BK
F11
+Bk2 -B1I -B2I -B3I -B4I -B5I -B6I
RD/WH
F11
BL
F10
RD
F10
GRN
F10
BL
F11
RD
F11
GRN
F11
+G
BK
F8/F9
-G1 -G2 -G3 -G4 -G5 -G6
YL
F8
RN
F8
RD
F8
YL
F9
RN
F9
RD
F9
Connection example
(Injector 1)
Bk1
F10 B1I
Bk1
B1O
4 cylinders configuration
6 cylindres configuration
RAIL 2
F9
G6
D
F9
G4
G3
G2
C
RAIL 1
D
C
B
B
G5
G4
G3
A
A
D
G1
F8
C
B
G2
G1
A
Input channel
Input selector
Processing channel
Output selector
Output channel
Petrol injector
B1
B2
B3
B4
B5
B6
CH 1
G1
G2
G3
G4
G5
G6
Gas injector
Fig.1a
Fig.2a
Example:
4 cylinders configuration with single 4 output gas rail
Streight assembly
CH1 : B=1 -> G=1
CH2 : B=2 -> G=2
CH3 : B=3 -> G=3
CH4 : B=4 -> G=4
( A)
( B)
( C)
( D)
Channel 1
Mirrored assembly at 180°
CH1 : B=1 -> G=4 ( D)
CH2 : B=2 -> G=3 ( C)
CH3 : B=3 -> G=2 ( B)
CH4 : B=4 -> G=1 ( A)
6 cylinders configuration with double 3 output gas rail
Streight assembly
CH1 : B=1 -> G=1
CH2 : B=2 -> G=2
CH3 : B=3 -> G=3
CH4 : B=4 -> G=4
CH5 : B=5 -> G=5
CH6 : B=6 -> G=6
Input
selector
Output
selector
( A’)
( B’)
( D’)
( A’’)
( B’’)
( D’’)
Stimulation button
(test)
N.B. To check the injectors
the engine must be steady
Mirrored assembly at 180°
CH1 : B=1 -> G=3 ( D’)
CH2 : B=2 -> G=2 ( B’)
CH3 : B=3 -> G=1 ( A’)
CH4 : B=4 -> G=6 ( D’’)
CH5 : B=5 -> G=5 ( B’’)
Ch6 : B=6 -> G=4 ( A’’)
IMPX
RPM meter
Page 4 of 24
Injection time threshold up to
the rpm meter determine
the engine phase
Number of injection per
cycle.
Rpm meter:
The current engine RPM calculation it is elaborated regarding aquired
parameters checking the signal on the elaborated channel
1.
Prescaler:
(Injection number per cycle of combustion on one petrol injection)
This parameter is used by the system to get the correct RPM value.
The value must be set relatively of injection strategy adopted by petrol
injection system ECU.
Example:
Prescaler = 1
Minimun threshold = 1,2 ms
Injectionj 1 Extrapulse
The injection time is lower than
minimun threshold
therefore that’s not considered.
Injection 2
1 = SEFI (sequential) : The injectiors are active singularly,
one cylinder therefore it’s fed in just one time
per combustion cycle.
2 = Batch fired 2 Banks : The injectors are divide in two bank
one cylinder therefore it’s fed two time per combustion cycle.
4 = Batch fired 1 Bank (4 cylinders) : The injectors are drived
simultaneously therefore one cylinder in a 4 cylinders engine it’s
fed 4 times.
6 = Batch fired 1 Bank (6 cylinders) : The injectors are drived
simultaneously therefore one cylnder in one 6 cylnders engine it’s
fed 6 time.
7,2 ms
0,8 ms
P=Engine cycle period
40 ms
8,1 ms
RPM=
(
(
1min
)
.
Msec
P
Rotation
1 cycle
) (
=
60000 ms
40 ms
1
.
2
)
=
3000 g/min
Prescaler
IMPX
CommutAtor
Switcher:
The switcher operation is characterized by logical functions customizable wich:
- Iterative control of switching processes.
- Assisted switching to gas on regarding the pressure reducer thermal status.
- Assisted switching to gas on regarding the engine load.
- Automatic switching to petrol if a lead pneumatic or a thermal reducer anomaly has been found
- Gas pressure management while assisted commutation phase.
Page 5 of 24
The current value of checked parameters
Thermal conditions setup
needed to enable the
gas switching.
Pneumatic conditions setup
required to enable the
gas switching.
Phase 1; Wait
: The system will wait a time
corresponding to setted seconds value during
the engine will be feeded to petrol.
Phase 2 ; Temperature test
: It comes verified
temperature of the reducer and if this is
insufficient attends the heating. When the
temperature is sufficient comes executed a gas rail
load until attainment the ideal pressure in order then
attends an equal time to the set up value in second
before proceeding to successive phase.
Phase 3 ; Drainage rail
: It comes unloaded
the present rail gas until attainment the
ideal gas pressure in order then switch to gas
if that is completed in an lower time
to that set time, otherwise passes to the
successive phase.
Phase 4 ; Switching wait
: The system attends an
set up value in second equal time during
which the engine is fed to petrol to
allow the alignment of petrol feeding system
integrators.
Iterative control setup of the
gas switching.
Pressure switching control enable.
PETROL
OFF
Engine
Rail Gas Load
PETROL
PHASE 3
Rail drainage
alignment
gas pressure
PHASE 4
Waiting
GAS
GAS
PHASE 1
Waiting
PHASE 2
Wait minimun
temprerature and
oganized the
injectors gas
Ideal pressure caught up
Recommended Parameter:
- Allow to gas switching
if
the reducer temperature is
upper to
=
40 °C
- Automatic switching
to petrol if
the reducer temperature is
lower to = 8 °C
- Automatic switching
to petrol if the gas pressure
is
over =0,3 Bar lower to ideal pressure
Phase 1 = 15 seconds
Phase 2 = 1 second
Phase 3 = 5 seconds
Phase 4 = 2 seconds
Check switching pressure
=
enable
Warning: During the autocalibration procedure the auto switching function
is auto disabled to avoid unexpected auto switching, so if you want to enable
this function must you enable her by checking appropriate flag present in the
switching setup window.